Technical data
N7280
N7280N7280
N7280-
--
-90034
9003490034
90034-
--
-
Rev. A
Rev. ARev. A
Rev. A
System
SystemSystem
System Installation and Verification
Installation and Verification Installation and Verification
Installation and Verification
13
1313
13
6
6 6
6 System Hardware Installation and Setup
System Hardware Installation and SetupSystem Hardware Installation and Setup
System Hardware Installation and Setup
Site preparation and movement to the final location should
be complete at this point. Verify correct placement of the
main unit and monitor arm with your customer. See Figure
7. Begin assembly of the Medalist x6000 system using the
following procedure:
1
11
1 Stage release — There are several tie wraps securing
the stage inside the main cabinet. Remove these to
allow X. Y movement and rail width movement. See
Figure 8.
Figure 8: Stage release