Technical data

N7280
N7280N7280
N7280-
--
-90034
9003490034
90034-
--
-
Rev. A
Rev. ARev. A
Rev. A
System
SystemSystem
System Installation and Verification
Installation and Verification Installation and Verification
Installation and Verification
9
99
9
8
88
8 System Placement — When the system has been
delivered to the install area, move it to the desired
placement location. Position the system according to the
customer’s requirements. Install the foot pads with
spacers for the estimated height requirement. See
Table 2. It is recommended that the pads and spacers be
put on while the system is elevated by the fork lift. The
system can be lowered on to the pads and spacers,
however this is extremely difficult to do.
Table 2: Spacer size reference
Spacer
Spacer Spacer
Spacer
In Centimeters
In CentimetersIn Centimeters
In Centimeters
In Inches
In InchesIn Inches
In Inches
Quantity
QuantityQuantity
Quantity
Spacer A (E7200-24715) 1.60 cm 0.630 in. 4
Spacer B (E7200-24717) 3.175 cm 1.25 in. 8
Spacer C (E7200-24716) 7.62 cm 3.0 in. 4
If the Medalist x6000 system is to be integrated into a production line, you may wish to level and
adjust height at the same time. Align the Medalist x6000 with the production line using the lines
marked on the outer barrier frame.
Table 3 - Height configuration chart
Spacer Combinations
Spacer CombinationsSpacer Combinations
Spacer Combinations
Minimum Height in
Minimum Height inMinimum Height in
Minimum Height in
centimeters (inches)
centimeters (inches)centimeters (inches)
centimeters (inches)
Maximum Height in
Maximum Height inMaximum Height in
Maximum Height in
centimeters (inches)
centimeters (inches)centimeters (inches)
centimeters (inches)
A 82.3 (32.4) 84.1 (33.1)
B 83.8 (33.0) 85.6 (33.7)
A B 85.3 (33.6) 87.4 (34.4)
B B 86.9 (34.2) 88.9 (35.0)
C 88.1 (34.7) 90.2 (35.5)
A B B 88.6 (34.9) 90.4 (35.6)
A C 89.9 (35.4) 91.7 (36.1)
B C 91.4 (36.0) 93.2 (36.7)
A B C 92.9 (36.6) 95.0 (37.4)
B B C 94.5 (37.2) 96.5 (38.0)
A B B C 96.3 (37.9) 98.0 (38.6)
9
99
9 Check System Height and Position — If the Medalist
x6000 is installed on a production line, adjust the
system location such that the fixed rail aligns with the
production line conveyors. Markings will be on each
outer barrier frame to show where the stage position for
loading and unloading will be. See Figure 4. Use these
markings to align height and position of the Medalist
x6000 with the customer’s line.
NOTE