Technical data
N7280
N7280N7280
N7280-
--
-90034
9003490034
90034-
--
-
Rev. A
Rev. ARev. A
Rev. A
System
SystemSystem
System Installation and Verification
Installation and Verification Installation and Verification
Installation and Verification
8
88
8
The system while on its pallet is 2.44 meters or 96 inches high. This height plus the required forklift
lifting distance is needed for (clearance) movement while on the shipping pallet.
4
44
4 Move Medalist x6000 To Install Site — When you are
ready, (using acceptable lifting equipment) raise the
Medalist x6000 from its pallet and move to the install
area.
Be very careful while moving the forklift in place to remove the Medalist x6000 from its pallet.
You should do this from the front of the unit and ensure forks protrude entirely through the
frame (you can see them on the other side) to enable secure movement of the system.
5
55
5 Staging — Organize all materials in the installation
area. Prior to beginning installation, find the x6000 ship
kit. This kit contains the foot pads and spacers (part
number N7280-80024).
6
66
6 Clear Packaging — Remove all remaining items from
the Medalist x6000 pallet. Remove the remaining
packing materials, straps, padding etc. from the
Medalist x6000. Tape is applied to the edges of the
tower door to prevent damage during shipping. Be sure
to remove this tape to ensure a good door seal.
7
77
7 Inspect the Medalist x6000 — Inspect the Medalist
x6000 and accessories for damage. Inspect system
exterior for abrasions or dents. Record any damage on
the waybill. Advise the carrier and contact the Agilent
Customer Support Center immediately.
Never use jacks or the forklift on the granite base to raise the system.
For your safety, be sure to coordinate the lowering of the Medalist x6000 onto the threaded
foot pads and spacers with the personnel managing the move. Never place any part of your
body underneath the system while it is on the forklift.
WARNING
CAUTION
CAUTION
NOTE