Technical data

N7280
N7280N7280
N7280-
--
-90034
9003490034
90034-
--
-
Rev. A
Rev. ARev. A
Rev. A
System
SystemSystem
System Installation and Verification
Installation and Verification Installation and Verification
Installation and Verification
4
44
4
4
4 4
4 What has to be done before installation begins?
What has to be done before installation begins?What has to be done before installation begins?
What has to be done before installation begins?
All system components and software have been delivered
and an acceptable site has been chosen for installation. All
utilities (air, electric, etc.) are ready for the installation and
are at the site of installation as specified in the Site
Preparation Manual.
An Agilent authorized service representative must be present to break the seal on the truck and for
pallet unloading, system movement, uncrating and placement (whenever possible).
Table 1: Required tools and equipment
(In addition to your standard tool kit you will need the following tools):
Description
DescriptionDescription
Description
Notes
NotesNotes
Notes
Tower Door T- handle 5/16 inch (8710-2341)
GM (Geiger Mueller) Radiation meter Victoreen/Inovision/Fluke 190, 290 GM
Technical Associates P-8 Neon GM
Berthold TOL-F GM/Ion Chamber (Europe Only
Europe OnlyEurope Only
Europe Only)
Ion Chamber Radiation meter
Victoreen/Inovision/Fluke 440 RF/D, 451P,
450P Ion Chamber
Inner and Outer Barrier Interlock Tool Kit N7280-88784
Panel Handling Test Panel N7280-60151
Interlock Adjustment Meter Kit N7280-88783
NOTE