User`s guide
Load Monitor
Statistics: T1/E1
5967–9446 319
Time Graph,
continued
✓ − ✓
Total Errors Frame Relay: Calculated from Out of
Frame Defects, Path Coding Violations,
Line Coding Violations, Loss of Frame,
Loss of Signal, Remote Alarm
Indications, Alarm Indication Signal
Defect, TS16 Alarm Indication Signal
Failure, Loss of Multiframe, and Far
End Loss of Multiframe.
PPP: Calculated from those for Frame
Relay, plus In Bad Addresses, Out Bad
Addresses, In Bad Controls, Out Bad
Controls, In Long Frames, Out Long
Frames, In Bad PPP FCSs, and Out Bad
PPP FCSs.
✓✓✓
Total Frames Calculated from In Frames and Out
Frames.
✓✓✓
Total Octets Calculated from In Octets and Out
Octets.
✓✓✓
Total Utilization Frame Relay, PPP: Total Octets
divided by twice the media speed,
expressed as a percentage.
Frame Relay PVC: Total Octets
divided by the sum of the forward and
reverse CIRs, expressed as a percentage.
✓ − ✓
Unavailable Seconds Number of seconds for which the
network was unavailable.
Source,
Destination,
Conversation,
Protocol, and
Size* Graphs
✓✓✓
Octets Calculated from information in
representative packets sent to ERM.
*Only Packets and Octets can be viewed in the
Size graph.
✓✓✓
Packets
✓✓✓
Utilization %
Table 32 Load Monitor Statistics: T1/E1, continued
Fr. Relay.
FR PVC
PPP
Statistic Description