Specifications

2-3
Installation
Preparation for Use
Preparation for Use
This section should be read before you install your system. It contains the following:
Initial Inspection
Operating Requirements
Line Voltage Selection
•LineFuses
Power Cables
HP-MSIB Address Switches
GPIB Address Switches
Bench Operation
Rack Mount Kits
Initial Inspection
WARNING To avoid hazardous electrical shock, do not perform electrical tests
when there are signs of shipping damage to any portion of the
outer enclosure (covers, panels, meters).
Inspect the shipping container for damage. If the shipping container or cushioning
material is damaged, it should be kept until the contents of the shipment have been
checked for completeness and the elements in your system have been checked both
mechanically and electrically. Procedures for checking the electrical operation are given
startingonpage11-1ofthismanual.
If any element in your system appears damaged or is defective, contact the nearest Agilent
service office. Agilent will arrange for repair or replacement of the equipment without
waiting for a claim settlement. Retain the shipping materials for the carrier to inspect.
Undamaged shipping materials should be kept. Original Agilent or equivalent shipping
materials are required for system or module re-shipment, as substandard packaging may
result in damage. Refer to Returning Instruments for Service on page 1-9 for information
on re-shipment.
To Fit an Instrument Hardkey Panel
On all Agilent 71612 systems, the instrument hardkey panel is fitted to the display at the
factory. For Agilent 70843 orders where the user already has an Agilent 70004A display,
refer to page 2-11 of the Agilent 70004A Display Installation and Verification manual
(part number 70004-90005) for advice on fitting the instrument hardkey panel.