Specifications

2-2
Installation
Introduction
Introduction
This chapter enables you to install your system ready for use. The information is presented
under the following headings:
Preparation for Use: Provides information you should read before you
install your system. It contains information on initial
inspection, power requirements, address switches
and rack mount kits.
System Installation: Shows you how to install your system. As you
progress through the procedure, you will be directed
to other relevant information.
System Verification: Describes how you power-on and verify correct
system installation.
Selftest at Power-on: Details the instrument status during selftest at
power-on.
Installing/Removing Modules: Describes how you install a clock source module
into a Display and Mainframe.
WARNING If this instrument is not used as specified, the protection provided
by the equipment could be impaired. This instrument must be used
in a normal condition only (in which all means for protection are
intact).