Technical data
Table Of Contents
- Contents
- Introduction
- System Description
- Installation
- Overview
- Step 1: Selecting a Location
- Step 2: Unpack and Inspect the Instrument
- Step 3: Set Up the Vacuum Pump
- Step 4: Connect the Power Cord
- Step 5: Install the Dry Compressed Air or O2 Supply
- Step 6: Install the Signal Output Cables
- Step 7: Install the Dual Plasma Burner
- Step 8: Install the Dual Plasma Controller
- Step 9: Install Column Connections
- Step 10: Install the Transfer Line
- Front Panel Controls and Initial Startup
- Operation
- Maintenance
- Pump Maintenance
- Cleaning the Detector
- Changing the Oil Mist Filter (RV5)
- Reaction Cell Cleaning
- Flow Sensor Calibration
- Detector Sensitivity
- Assembling the Dual Plasma Burner for Component Replacement with the SCD
- Assembling the Dual Plasma Burner for Component Replacement with the NCD
- Tube Replacement for the SCD
- Tube Replacement for the NCD
- Troubleshooting
- Index

Operation and Maintenance Manual 91
7
Position the upper ceramic tube into the long axis of the splitter fitting so
that about 4 mm of it extends past the top of the fitting. Slide the 0.054" ID
double tapered ferrule over the upper ceramic tube. Gently holding these
parts so that neither the ferrule nor the upper ceramic tube slips out of
position, finger-tighten the union fitting onto the splitter fitting.
Figure 26 Proper Ferrule Orientation to the Large Ceramic Tube
Figure 27 Large Ceramic Tube Properly Inserted into the Quartz Heater Assembly