Technical data
Table Of Contents
- Contents
- Introduction
- System Description
- Installation
- Overview
- Step 1: Selecting a Location
- Step 2: Unpack and Inspect the Instrument
- Step 3: Set Up the Vacuum Pump
- Step 4: Connect the Power Cord
- Step 5: Install the Dry Compressed Air or O2 Supply
- Step 6: Install the Signal Output Cables
- Step 7: Install the Dual Plasma Burner
- Step 8: Install the Dual Plasma Controller
- Step 9: Install Column Connections
- Step 10: Install the Transfer Line
- Front Panel Controls and Initial Startup
- Operation
- Maintenance
- Pump Maintenance
- Cleaning the Detector
- Changing the Oil Mist Filter (RV5)
- Reaction Cell Cleaning
- Flow Sensor Calibration
- Detector Sensitivity
- Assembling the Dual Plasma Burner for Component Replacement with the SCD
- Assembling the Dual Plasma Burner for Component Replacement with the NCD
- Tube Replacement for the SCD
- Tube Replacement for the NCD
- Troubleshooting
- Index

8 Operation and Maintenance Manual
Italiano
WARNING
Qualsiasi intervento debba essere effettuato sullo strumento può essere
potenzialmente pericoloso a causa della corrente elettrica. Il cavo di alimen-
tazione deve essere staccato dallo strumento prima della sua apertura.
WARNING
Per la protezione da rischi da incendio in seguito a corto circuito, sostituire I
fusibili di protezione con quelli dello stesso tipo e caratteristiche.
WARNING
Il simbolo sullo strumento avverte l'utilizzatore di consultare il Manuale di
Istruzioni alla sezione specifica.
WARNING
Questo strumento è conforme alle specifiche per I prodotti in Classe I - Il cavo di
alimentazione dalla rete deve essere munito di "terra". Qualsiasi interruzione del cavo di
terra all'interno ed all'esterno dello strumento potrebbe risultare pericolòsa. Sono
proibite interruzioni intenzionali.
WARNING
Se questo strumento viene utilizzato in maniera non conforme alle specifiche di Agilent,
le protezioni di cui esso è dotato potrebbero essere alterate.