Technical data
Table Of Contents
- Contents
- Introduction
- System Description
- Installation
- Overview
- Step 1: Selecting a Location
- Step 2: Unpack and Inspect the Instrument
- Step 3: Set Up the Vacuum Pump
- Step 4: Connect the Power Cord
- Step 5: Install the Dry Compressed Air or O2 Supply
- Step 6: Install the Signal Output Cables
- Step 7: Install the Dual Plasma Burner
- Step 8: Install the Dual Plasma Controller
- Step 9: Install Column Connections
- Step 10: Install the Transfer Line
- Front Panel Controls and Initial Startup
- Operation
- Maintenance
- Pump Maintenance
- Cleaning the Detector
- Changing the Oil Mist Filter (RV5)
- Reaction Cell Cleaning
- Flow Sensor Calibration
- Detector Sensitivity
- Assembling the Dual Plasma Burner for Component Replacement with the SCD
- Assembling the Dual Plasma Burner for Component Replacement with the NCD
- Tube Replacement for the SCD
- Tube Replacement for the NCD
- Troubleshooting
- Index
Operation and Maintenance Manual 57
Step 5: Install the Dry Compressed Air or O
2
Supply
Connect a 1/8" OD PTFE (PFA) line fitted with a 1/8" brass Swagelok nut from
the AIR INLET at the rear of the Detector (see Figure 17) to a supply of dry
compressed air or oxygen. The air regulator located inside the front door of the
Detector should be set to approximately 3-6 psi.