Technical data
Table Of Contents
- Contents
- Introduction
- System Description
- Installation
- Overview
- Step 1: Selecting a Location
- Step 2: Unpack and Inspect the Instrument
- Step 3: Set Up the Vacuum Pump
- Step 4: Connect the Power Cord
- Step 5: Install the Dry Compressed Air or O2 Supply
- Step 6: Install the Signal Output Cables
- Step 7: Install the Dual Plasma Burner
- Step 8: Install the Dual Plasma Controller
- Step 9: Install Column Connections
- Step 10: Install the Transfer Line
- Front Panel Controls and Initial Startup
- Operation
- Maintenance
- Pump Maintenance
- Cleaning the Detector
- Changing the Oil Mist Filter (RV5)
- Reaction Cell Cleaning
- Flow Sensor Calibration
- Detector Sensitivity
- Assembling the Dual Plasma Burner for Component Replacement with the SCD
- Assembling the Dual Plasma Burner for Component Replacement with the NCD
- Tube Replacement for the SCD
- Tube Replacement for the NCD
- Troubleshooting
- Index

Operation and Maintenance Manual 49
Figure 11 RV5 Oil-Sealed Vacuum Pump and Associated Traps (Front Side)
Figure 12 RV5 Oil-Sealed Vacuum Pump and Associated Traps (Back Side)
Oil mist
filter
Po wer switc
h
Mode selector
Edwards
EDWARDS
Oil return line
Chemical
Trap
Mo unting
Bracket
Ballast control
Barbed V acuum Inlet
Oil Mist
Filter
Chemical Trap
EDWARDS
5
Po wer
Plug
Ballast Co ntro l
Oil Return
Line