Technical data
Table Of Contents
- Contents
- Introduction
- System Description
- Installation
- Overview
- Step 1: Selecting a Location
- Step 2: Unpack and Inspect the Instrument
- Step 3: Set Up the Vacuum Pump
- Step 4: Connect the Power Cord
- Step 5: Install the Dry Compressed Air or O2 Supply
- Step 6: Install the Signal Output Cables
- Step 7: Install the Dual Plasma Burner
- Step 8: Install the Dual Plasma Controller
- Step 9: Install Column Connections
- Step 10: Install the Transfer Line
- Front Panel Controls and Initial Startup
- Operation
- Maintenance
- Pump Maintenance
- Cleaning the Detector
- Changing the Oil Mist Filter (RV5)
- Reaction Cell Cleaning
- Flow Sensor Calibration
- Detector Sensitivity
- Assembling the Dual Plasma Burner for Component Replacement with the SCD
- Assembling the Dual Plasma Burner for Component Replacement with the NCD
- Tube Replacement for the SCD
- Tube Replacement for the NCD
- Troubleshooting
- Index

108 Operation and Maintenance Manual
3
Remove the old fuses from the holder and replace with new fuses.
If the Controller still does not power on after replacing the fuse, contact
Agilent.
Consult Table 4 for the appropriate replacement fuse.
Table 4 Fuses for 100 V, 120 V and 230 V Versions of 355 SCD and 255 NCD
100/120 V 230 V
Detector Back Panel
Main AC Power 15 A/250 V
3AG slo–blo
T10 A/250 V
5 x 20mm
Detector
Electronics Power Supply (F1) 250 mA/250 V
3AG slo–blo
T125 mA/250 V
5 x 20mm
Pump (F2) 15 A/250 V
3AG slo–blo
T5 A/250 V
5 x 20mm
Ozone Generator (F3) 1 A/250 V
3AG slo–blo
T100 mA/250 V
5 x 20mm
Photomultiplier Tube Cooler 1 A/250V
3AG slo–blo
T500 mA/250V
5 x 20mm
Dual Plasma Controller Back Panel
Main AC Power (2 fuses) T2 A/250 V
5 x 20mm
1 A/250 V
5 x 20mm
Figure 47 Fuse Positions on the Power Supply Board
OZONE
PUMP
F1
F3
F2
ELECTRONICS
Side View
ELECTRONICS
OZONE
PU MP
1
A
T .50 A
10 A
Front View (230 V Unit)
0.1
A
5 A