User guide
Inlets 8
Advanced User Guide 267
During sampling
Pressure upsets caused by switching valves in the external
sampler can cause fluctuations in column flow rates. To
compensate for this, the interface is flow controlled during
sampling time. The sampling flow rate is calculated from the
pressure setpoint that is active when sample introduction
begins. This flow control starts when the GC goes into the Pre
Run state (when your system is automated and the Pre Run
light is on or during manual operation when you press [Prep
Run]) and ends after the interface’s Sampling end setpoint
expires.
Flow to the interface is measured by a flow sensor and
controlled by a proportional valve.
Valve
Frit
Frit
Frit
Valve
EPC Module
FS = Flow Sensor
PS = Pressure Sensor
Column
FS
PS
PS
Carrier Supply
80 PSI
Septum Purge
Gas Sampling Valve
Headspace
Purge and Trap