User guide
100 Advanced User Guide
4 Chromatographic Checkout
Inlet temperature 80 °C
Initial time 0.1 min
Rate 1 720 °C/min
Final temp 1 350 °C
Final time 1 2 min
Rate 2 100 °C/min
Final temp 2 250 °C
Final time 2 0 min
Purge time 0.75 min
Purge flow 60 mL/min
Septum purge 3 mL/min
Detector
Temperature 200 °C (On)
Hydrogen flow 75.0 mL/min (On)
Air (oxidizer) flow 100.0 mL/min (On)
Mode Constant makeup flow Off
Makeup flow 60.0 mL/min (On)
Makeup gas type Nitrogen
Flame On
Lit offset Typically 2 pA
High voltage On
Oven
Initial temp 70 °C
Initial time 0 min
Rate 1 10 °C/min
Final temp 105 °C
Final time 0 min
Rate 2 20 °C/min
Final temp 2 190 °C
Final time 2 7.25 min for sulfur
12.25 min for phosphorus
ALS settings (if installed)
Table 17 FPD Phosphorus Checkout Conditions (continued)