Technical data
Table Of Contents
- Content
- Installation
- Set-Up
- Installation Verification
- Step 1. Auto tune
- Step 2. Set up method names and parameters
- Step 3. Create MMCHECKTOF_EI_POS.m
- Step 4. Create MMCHECKTOF_EI_NEG.m
- Step 5. Create MMCHECKTOF_CI_POS.m
- Step 6. Create MMCHECKTOF_CI_NEG.m
- Step 7. Create MMCHECKTOF_MX_EI POS_CI POS.m
- Step 8. Create MMCHECKTOF_MX_EI NEG_CI NEG.m
- Step 9. Run each of the methods created
- Step 10. Calculate the response of Multimode Demo
- Step 11. Fill out Multimode Report for calculation of peak heights
- Index

20 Multimode Source for 6510 Q-TOF LC/MS Set-Up Guide
1 Installation
To convert from ESI or APCI to the multimode source
16 Connect the LC/MS sample tubing to the LC/MS diverter valve inlet filter.
17 If you are installing the multimode source for the first time, follow the steps
in “Step 2. Install the HV control PCA and cables” on page 9.
WARNING
The LC/MS Liquid Chromatograph diverter valve is an integral part of the G1978B
safety system. The LC mobile phase flow must always be connected to the diverter
valve inlet filter. Never bypass the diverter valve and connect directly to the
nebulizer. If the diverter valve is used in a manner not specified by Agilent
Technologies, the protections provided by the diverter valve may be impaired.