Installation guide

Setting Up ParBERT Unpacking ParBERT
32 Agilent 81250 ParBERT Installation Guide, February 2002
Unpacking ParBERT
When you receive ParBERT, it is recommended that you inspect the
container and its contents.
NOTE If the contents are incomplete, if there is mechanical damage or if any of
the instruments does not pass the selftest, notify your nearest Agilent
Technologies office. Keep the shipping materials for inspection by the
carrier. The Agilent office will arrange for repair or replacement without
awaiting settlement.
Inspect the shipping container and its contents for damage.
If the container or cushioning material is damaged, keep it until the
contents of shipment have been checked for completeness and the
instrument has been verified both mechanically and electrically.
WARNING To avoid the hazard of electric shock, do not perform electrical tests
when there are signs of shipping damage to any of the instrument’s
outer covers or panels.
Check the contents of shipment.
See the packing list for exact details.
Checking the Clock Distribution
Cables
The clock distribution cables supply the clock pulse from the clock
module to the other modules of the clockgroup.
The clock distribution cables connect the SYSTEM CLOCK OUTPUTS of
the clock module (up to eleven) with the SYS CLK IN ports of the data
generator/analyzer modules.