Service manual

40 Chapter 2
Troubleshooting
Perform Measurement System Verification
Step 1. Write Signal Test at Connection Board
1. Connect the cables between the ‘W+’ and ‘W-’ on the fixture board and the channels 1
and 2 on the oscilloscope.
NOTE Do not attach or remove the verification fixture while the access lamp on the connection
board is lit. Returning to the configuration menu will turn off the access lamp and allow
you to attach or remove the fixture.
These connections are shown in Figure 2-10.
Figure 2-10 Cable Connection of the Write Portion Check
2. Place copies of the following eight verification kit setup files in the appropriate folders:
NOTE Those files are provided through the internal web site of Agilent Technologies’ Component
Test Division - Kobe. Contact your nearest service center to obtain those files.
Be sure to place the files in the correct folders and not to destroy the other files in the
e5022 folder. Incorrect file operations is dangerous and may cause a system trouble or