User`s guide

42 E6651A User’s Guide
3 Base Station Emulator Mode
PMC-RSP Test
Upon establishing two way communications, control and
broadcast messages are transmitted between the E6651A and
the SS. The E6651A can test the power control performance
of the SS.
1 Set the PMC- RSP Test Mode: After establishing two way
communications, press in the BSE Mode
Selection Menu.
2 Set parameters: There are 3 sub menus in PMC- RSP test.
They are Power control mode, Start Frame and Power
Adjust.
Power Control Mode: Closed Loop power control and
Open Loop power control options can be selected. This
is a toggle function.
Start Frame: This is to set the start frame for power
control. Power control function is activated after the
number of frames defined by the button.
Power Adjust: This sets the amount of power adjustment.
3 Run the PMC- RSP Test: Pressing sends a
power control command to the subscriber station after
Start Frame.
Figure 17 PMC-RSP test
PMC-RSP Test
Send PMC-RSP