Technical data
166 Chapter 11
Example Test Scenarios
Verification Example
Example Test Scenarios
We create an acquisition row for the 1950 MHz uplink, with a long duration (140 MHz) so that the entire
falling and rising power sequence can be included.
Figure 11-20. New Acquisition Row
We download this sequence to the test by clicking the
Download to Instrument button, and click the Read
Sequence Trace button so that the captured data can be seen in the graph display.
Figure 11-21. Reading the Sequence Trace