Technical data
Programming With TestExec SL 3
E6198B Switch/Load Unit Software Manual 3-9
After all actions is defined and saved. You can create a testplan
and use all actions for further testing. Figure 3-18 shows one
simple example to load a load card’s switching path. The first
action must declare connectivity either via parallel port or USB
port (SetUSB=0-parallel port; 1-USB port). Then, following
actions are InitSlu, SetLoadSwitch, GetLoadSwitch and
CloseSlu.
Figure 3-18 Example of Calling Load Card Testplan
Second action is InitSlu. This action is used to initialize the
Switch/Load Unit. Set boxNr as ‘0’ to initalize SLU number 1.
Figure 3-19 Parameter of InitSlu