54 Planning System Testplans Chapter 3
Planning The Resources And Fixture
The goal of the resource planning step is to determine the use and connect
strategy for instruments and loads. The result is a description of the Test
System Interface/Mass Interconnect fixture that makes the connections
between the test system and the UUT.
Determining
System Resources
Before planning the fixture you must know what resources are available in
the system and where you can access them. The Agilent TS-5400 System
Description Worksheet organizes this information. The worksheet should be
completed before the first fixture is built and then added to when hardware
is added to the system. When adding hardware, it is important to make sure
the new hardware will not interfere with an already existing test or fixture.
Agilent TS-5400
System Description
Worksheet
Figure 3-2 shows an example Agilent TS-5400 System Description
Worksheet using the Test System Interface and Figure 3-3 shows a
worksheet for the Mass Interconnect.
Figure 3-2. Example Agilent TS-5400 System Description Worksheet using a Test System Interface