Installation guide
Post-Repair Procedures
Post-Repair Procedures Matrix
4-3
Table 4-2 Performance Tests for Assemblies A1 through A16
Performance Tests
The following performance tests are listed in the
order that they should be performed to minimize
changes in test equipment configurations.
Self Test should be performed each time that any
assembly is repaired or replaced.
Replaced Assembly
A1 Keyboard
A2 Display
A2DS1 Display Backlight
A3 Front Panel Auxilary Board
A4 Inverter
A5 10 GB Hard Drive (Option 005)
A6 Power Supply
A7 Baseband Generator (Option 001)
or A7 Baseband Generator (Option 002)
A9 Digital Demodulator (Option 501, 502, 503, 504 with Option 300)
A10 I/Q Multiplexer (Option 501, 502, 503, 504 or Option UNJ)
or A10 I/Q Multiplexer (Option 506)
A11 Internal Bit Error Rate Analyzer (Option UN7)
A12 CPU
A13 Output (Option 501, 502, 503, 504 or Option UNJ)
or A13 Output (Option UNB)
A14 Extended Frequency Output (Option 506)
A15 Sampler (Option UNJ or Option 506)
A16 Frac-N (Option UNJ or Option 506)
CDMA Adjacent Channel Power
(Not Used with Option UNB or Option 506)
XX X
WCDMA Adjacent Channel Power
(Option 400)
X X X
Phase Noise and Residual FM
(Manual Test - Option UNJ or Option 506Only)
XXXXX
Dual Arbitrary Waveform Generator Check X X
GSM Loopback BER Check
(Option 300 Only)
XX X