Installation guide
Assembly Replacement
A23 Motherboard
2-53
Replacement Procedure
1. Reverse the order of the removal procedure.
2. Torque all T-10 screws to 9 in-lbs.
3. Torque all RF connectors to 9 in-lbs.
4. Torque all 5/8” nuts to 9 in-lbs.
5. Torque all 5/16” nuts to 9 in-lbs.
6. Perform the post-repair adjustments and performance tests that pertain to this removal procedure.