Technical data
1 Calibration Procedures
Performance Verification Tests
6 E3632A Service Guide
Performance Verification Tests
The performance verification tests use the power supply's
specifications listed in the E3632A User’s Guide.
You can perform two different levels of performance
verification tests:
•Self-test
A series of internal verification tests that provides high
confidence that the power supply is operational.
• Performance verification tests
These tests can be used to verify the power supply
specifications following repairs to specific circuits.
Self-test
A power- on self- test occurs automatically when you turn on
the power supply. This limited test assures you that the
power supply is operational.
The complete self- test is enabled by pressing the
key (actually any front panel keys except the key)
and the power- line switch simultaneously and then
continuing to press the key for 5 seconds. The
complete self- test will be finished in 2 more seconds.
You can also perform a self- test from the remote interface
(see chapter 3 in the E3632A User's Guide).
• If the self- test is successful, PASS is displayed on the
front panel.
• If the self- test fails, FAIL is displayed and the ERROR
annunciator turns on. If repair is required, see
Chapter 2,
“Service” for further details.
• If self- test passes, you have a high confidence that the
power supply is operational.
Recall
Error
Recall