Service manual

Inspection/
Shipping
This section contains initial (incoming) inspection and shipping guidelines
for the matrix modules.
Initial
Inspection
Use the steps in Figure 1-2 as guidelines to perform initial inspection of one
of the modules. Verification Tests are optional.
WARNING
To avoid possible hazardous electrical shock, do not perform
electrical tests if there are signs of shipping damage to the
shipping container or to the instrument.
Agilent E1465A/66A/67A Service Manual General Information 13