User`s manual
[:DC]:POINt?
CALibration[:DC]:POINt? <value> takes the measured value for the current DC
calibration point, computes needed calibration constants, and sets up the
Agilent E1445A for the next measurement. When all measurements have been
made, the calibration constants are checked for validity. If the validity check passes,
the constants are stored in the Agilent E1445A’s non-volatile calibration memory
and the calibration count (
CALibration:COUNt? query) is incremented.
The
*RST command should be sent after completing the calibration procedure to
restore normal operation.
Calibration security must have been previously disabled. See the Agilent E1445A
Service Manual for detailed information on the use of this command.
Comments • Most of the Agilent E1445A’s commands cannot be executed while calibration is
in progress. The
*RST command may be used to prematurely terminate the
calibration procedure without affecting the stored calibration constants.
• Executable when Initiated: No
• Coupling Group: None
• Related Commands: CALibration[:DC]:BEGin, CALibration:SECure[:STATe]
•
*RST Condition: None
CALibration
Chapter 8 Command Reference 301