Service manual

Test 4-1: DC Voltage Test (Zero Volt Input)
This test verifies DC Voltage accuracy on all five ranges using a zero
volt input.
Equipment Setup 1. Connect the equipment as shown in Figure 4-1.
2. Set the E1411 multimeter as follows:
Reset Multimeter ..................................................*RST
Auto Zero .................................................................ON
Power Line Cycles (PLC) ............................................1
Line Freq Reference (CAL:LFR) ...... 50Hz or 60Hz
NOTE
*RST sets Auto Zero to ON and Power Line Cycles to 1.
Figure 4-1. DC Voltage (Zero Volt Input) Setup
20 Verification Tests Agilent E1411A/E1411B Service Manual