Technical data

54 Agilent U7232A DisplayPort Electrical Performance Compliance Test Application
6 Source Transition Time Differential Tests (Informative)
Probing for Source Transition Time Differential Tests
When performing the transition time test, the DisplayPort Electrical
Performance Compliance Test Application will prompt you to make the
proper connections. Your DisplayPort test environment setup on the Set
Up tab must match the physical connection.
Figure 16 and Figure 17 below show the differential and the single- ended
connections for Transition Time Diffential Tests.
.
Infiniium Oscilloscope
1168A or 1169A
Probe Amplifier
N5380A SMA probe head.
Connect the plus side of the
probe to the plus side of the
SMA probe head and the
negative side of the probe to
the negative side of the SMA
probe head.
Lane on the W2641A test fixture
SMA to SMP cables
DUT
Figure 16 Probing for Differential Tests - Transition Time Tests (Single Connection with
W2641A DisplayPort Test Fixture)