Technical data
26 Agilent U7232A DisplayPort Electrical Performance Compliance Test Application
3 Source Eye Diagram Differential Tests
Probing for Source Data Eye Diagram Differential Tests
When performing the data eye diagram test, the DisplayPort Electrical
Performance Compliance Test Application will prompt you to make the
proper connections. Your DisplayPort test environment setup on the Set
Up tab must match the physical connection.
Figure 4 and Figure 5 show a physical connection for making differential
and single- ended connections.
.
Infiniium Oscilloscope
1168A or 1169A
Probe Amplifier
N5380A SMA probe head.
Connect the plus side of the
probe to the plus side of the
SMA probe head and the
negative side of the probe to
the negative side of the SMA
probe head.
Lane on the W2641A test fixture
SMA to SMP cables
DUT
Figure 4 Probing for Differential Tests - Data Eye Diagram Tests (Single Connection with
W2641A DisplayPort Test Fixture)