Technical data
104 Agilent U7232A DisplayPort Electrical Performance Compliance Test Application
12 Source Main Link Frequency Compliance Differential Tests
Probing for Source Main Link Frequency Compliance Differential Tests
When performing the source main link frequency compliance tests, the
DisplayPort Electrical Performance Compliance Test Application will
prompt you to make the proper connections. Your DisplayPort test
environment setup on the Set Up tab must match the physical connection.
Figure 34 and Figure 35 below show the differential and the single- ended
connections for Main Link Frequency Compliance Tests.
.
Infiniium Oscilloscope
1168A or 1169A
Probe Amplifier
N5380A SMA probe head.
Connect the plus side of the
probe to the plus side of the
SMA probe head and the
negative side of the probe to
the negative side of the SMA
probe head.
Lane on the W2641A test fixture
SMA to SMP cables
DUT
Figure 34 Probing for Differential Tests - Main Link Frequency Compliance Tests (Single
Connection with W2641A DisplayPort Test Fixture)