Technical data

1
U7232A DisplayPort Compliance Testing Notes 3
DisplayPort Automated Testing—At A Glance
The Agilent U7232A DisplayPort Electrical Performance Compliance Test
Application helps you verify DisplayPort Source device under test (DUT)
compliance to DisplayPort specifications using an Agilent 8 GHz or greater
Infiniium digital storage oscilloscope. The DisplayPort Electrical
Performance Compliance Test Application:
Lets you select individual or multiple tests to run.
Lets you identify the device being tested and its configuration.
Shows you how to make oscilloscope connections to the device under
test.
Automatically checks for proper oscilloscope configuration.
Automatically sets up the oscilloscope for each test.
Provides detailed information for each test that has been run and lets
you specify the thresholds at which marginal or critical warnings
appear.
Creates a printable HTML report of the tests that have been run.
Compliance testing measurements are described in Section 3, Source
Compliance Tests, in the DisplayPort- Compliance Test Specification
Version 1 document. For more information, see the VESA web site at
www.vesa.org
.
Required Equipment and Software
In order to run the DisplayPort automated tests, you need the following
equipment and software:
8 GHz or greater Infiniium Oscilloscope. Option 001 (1 M/ch memory
upgrade) is recommended; this will greatly reduce Data Eye Pattern and
Jitter test time.
U7232A DisplayPort Electrical Performance Compliance Test
Application.
Keyboard, qty = 1, (provided with the Agilent Infiniium oscilloscope).
Mouse, qty = 1, (provided with the Agilent Infiniium oscilloscope).
Precision 3.5 mm BNC to SMA male adapter, Agilent p/n 54855- 67604,
qty = 2 (provided with the Agilent Infiniium oscilloscope).
Calibration cable (provided with the Infiniium oscilloscopes). Use a
good quality 50
BNC cable for calibrating the oscilloscope.
E2655A/B probe de- skew fixture.
NOTE
The tests performed by the DisplayPort Electrical Performance Compliance Test Application
are intended to provide a quick check of the electrical health of the DUT. This testing is not
a replacement for an exhaustive test validation plan.