Technical data

Module 11
Advanced Definitions and Operations
11-18
To Change Execution Flow
A
Subsite Procedure
No
Yes
status=True ?
Test Execution
B
Move to the 1
st
subsite
If you use the subsite procedure, change the flowchart as follows.
On the page 11-9, replace the box A with the block A shown above.
On the page 11-13 and 11-15, insert the box B shown above to the position B of the flowchart.