Technical data
7- 20 Agilent 41000 Administration Guide, Edition 3
Service
Replacement Procedure
Required Tools
The following tools are required for replacement procedure.
• Pozidrive screwdriver (PZ1)
• Torx screwdriver (T25)
• Plus screwdriver (H2)
• Nut driver (H8)
• Mini-screwdriver
•Nipper
• Slip-joint pliers
• Rubber gloves
• Cable ties
• Hand-held multimeter
• Tool Zip Lock Sealing (Agilent part number 8710-1576)
• Agilent 41000 Administration Guide (this book)
NOTE If the Agilent 41000 has been used in a clean room, take special precautions to preserve the
air purity in the clean room. Clean the tools, test equipment, replacement parts, and so on
by using the air shower to enter the clean room.