User's Manual
31
Figure 2-9. CC PARD Test Setup
Initialization Procedure
Follow the procedure if either the GPIB assembly has been replaced, or the EEPROM (U70) has been replaced:
1.  Install the GPIB assembly in the unit.
2.  Turn the power on and depending on your unit's model number, send string:
  "EEINIT 6030"
  "EEINIT 6031''
  "EEINlT 6032"
   or
  ''EEINIT 6035"
3.  Turn the power off, wait 5 seconds, then turn the power back on.
4.  If the GPIB assembly has been replaced, calibrate the unit.










