Technical data

1-2 Service Guide 85309-90082
Getting Started LO/IF Distribution Unit
STEP 1. Check the Shipment 85309B
STEP 1. Check the Shipment
1. Unpack the contents of the shipping container. Keep the packaging material in case the analyzer needs
to be returned to the factory.
2. Carefully inspect the 85309B to make sure that it was not damaged during shipment. If damaged, refer to
“Contacting Keysight” on page 1-12.
3. Use the Contents List in the shipping container to verify the completeness of your shipment. If not
complete, refer to “Contacting Keysight” on page 1-12.