Service manual

8510XF Network Analyzer Systems 2-5
Installation
Receiving the System
Receiving the System
The System as Shipped The 8510XF system will arrive with all rack components and instruments
installed and cabled in the system cabinet. The system cabinet is shipped
upright in a special crate (as illustrated in “Unpacking the System” on
page 2-11). The work surface is included in the system cabinet packaging.
The test heads are packaged separately from the system cabinet, in two
padded cartons.
When the entire shipment has arrived, contact your nearest Agilent
Technologies office to arrange for system installation, if installation is
available in your area (see “Contacting Agilent”).
Agilent Technologies
Customer Engineering
An Agilent Technologies Customer Engineer will be assigned to help you
install the system. During installation, the Customer Engineer will do the
following:
Uncrate the system cabinet (see “Unpacking the System” on page 2-11).
Complete the system checklist (see “System Checklists” on page 2-7).
Assemble the work surface and connect it to the system cabinet.
Install the test heads.
Verify that the GPIB addresses are set properly and power up the
system.
Run a performance verification of the system, which includes a
measurement calibration.
Provide user training for one engineer.
In Case of Problems
with the Shipment
If the shipment is damaged or incomplete, notify the nearest Agilent
Technologies office. If the shipping container is damaged or the packaging
material shows signs of stress, notify the carrier as well as the Agilent
Technologies Customer Engineer. Keep the shipping materials for the
carrier’s inspection. Agilent Technologies will arrange for repair or
replacement of damaged equipment without waiting for a claim settlement
from the carrier.