Installation
Site Preparation
Site Preparation
Power Requirements Before installing the system, be sure that the required ac power is available
at all necessary locations.
Three-wire power cables (which provide a safety ground) must be used
with all instruments.
Air-conditioning equipment (or other motor-operated equipment) should
not be placed on the same ac line that powers the system.
The table below lists the maximum VA ratings and BTU/hour ratings for
all instruments in the system. This table can be used to determine both
the electrical requirements and the air conditioning requirements of the
system.
NOTES:
(1) Values are based on 120 Vac supplied to each instrument at 60 Hz.
(2) The millimeter-wave controller supplies power to the test heads.
Table 2-1 Power requirements of the system
Standard Equipment
Instrument Maximum VA Rating Maximum BTU/hour
85101C display processor 250 850
85102B IF detector 210 714
83621B synthesized source (LO) 400 1360
83651B synthesized source (RF) 400 1360
E7341A millimeter-wave controller 500 1700
E7342L left test head (85 GHz)
or E7352L left test head (110 GHz)
(powered from controller) (powered from controller)
E7342R right test head (85 GHz)
or E7352R right test head (110 GHz)
(powered from controller) (powered from controller)
Total 1760 5984