Service manual

8510XF Network Analyzer Systems
4-7
Performance Verification
Verification Setup
3. A screen prompt will give you the opportunity to set the date and time.
Press the
[Y] key on the PC to skip this step, or press [N] to set the date
and time.
4. The program loads the System Configuration file, and displays the
System Hardware Configuration Menu. Use this menu to specify the
equipment you are using, and the frequency range you are verifying
(refer to “Frequency ranges” on page 4-4).
To setup for the first performance verification, select the proper
hardware setup for Low Band Verification (< 50 GHz) using Table 4-2
on page 4-4 for the E7352A 110 GHz system or Table 4-3 on page 4-4
for the E7342A 85 GHz system.
a. Select
NEXT or PREVIOUS to step through the list of selections for each
menu item.
b. Use the up and down arrow keys on the PC to advance from one
menu item to another.
c. Select
DONE when you have made a selection for each menu item.
5. The main menu is displayed (see Table 4-4).
Table 4-4 Main Menu
Softkey Description
System Config System Hardware and Software Configuration Menu
System Specs System Spec Table Menu
System Uncert System Uncertainty & Dynamic Accuracy Plot/Table Menu
Edit Specs Edit the System Specifications
Verify System System Performance Verification Menu
Quit Progam Quit this Program