Technical data
85108L System Manual
System Installation
System Arrival
2-2
System Arrival
The pulsed-RF network analyzer system will be rack-mounted, assembled, and with the cabling
attached when it arrives from the factory.
Keep the shipping containers in one area to help verify the receipt of all components ordered.
Inspect all shipping containers. Keep the carton and packaging material until the entire shipment
has been verified for completeness, and the system has been checked mechanically and electrically.
If the shipping container is damaged or the packaging material shows signs of stress, notify the
carrier as well as Agilent (see “Contacting Agilent” on page iv). Keep the shipping materials for the
carrier's inspection. An Agilent representative will arrange for repair or replacement of damaged
equipment without waiting for a claim settlement from the carrier.
Contact Agilent for Installation
When the entire shipment has arrived, contact an Agilent customer service engineer to arrange for
installation of your system (if installation is available in your area). The customer engineer will
check the shipment for completeness.
Setting Up the System
During the installation, the Agilent customer engineer will do the following:
1. Uncrate the system cabinet.
2. Complete the receiving checklist (see Table 2-1).
3. Turn on the system and verify that the GPIB address of each instrument is set properly.
4. Run a performance verification of the system, which includes a measurement calibration.