User manual

Installation Procedure
Maintenance
4
Profibus Gateway Switching off
To switch off the Profibus Gateway it is necessary to remove the
mains.
Maintenance
The Profibus Gateway does not require any maintenance. Any work
performed on the system must be carried out by authorized
personnel.
Before returning the Profibus Gateway to the constructor for repairs, or
replacement with a reconditioned unit, the "Health and Safety" sheet attached
to this instruction manual must be filled-in and sent to the local sales office. A
copy of the sheet must be inserted in the system package before shipping.
NOTE
If a Profibus Gateway is to be scrapped, it must be disposed of in
accordance with the specific national standards.
TSP Profibus Gateway User Manual / 87-900-119-01 (C) 29/58