Specifications
5
Contents
1 General Information
Accessories 10
Mainframe and Operating System 10
Specifications 11
Characteristics 12
Environmental Characteristics 12
Recommended Test Equipment 13
2 Preparing for Use
Power Requirements 16
Operating Environment 16
Storage 16
To inspect the module 16
To prepare the mainframe 17
To configure a one-card module 18
To configure a multi-card module 20
To install the module 26
To turn on the system 28
To test the module 28
To clean the module 29
3 Testing Performance
To assemble the SMA/Flying Lead test connectors 34
16760A Minimum Data Eye Width and Minimum Clock Interval Performance Test
Procedure 38
Equipment Required 39
Prepare the logic analysis system for testing 40
Initialize the test equipment for minimum data eye width/minimum clock interval
test 42
Connect the test equipment for the minimum clock interval/minimum eye width
test 44
Set up the test equipment 47
Verify and adjust 8133A pulse generator DC offset 47
Deskew the oscilloscope 48
Adjust the measured pulse width to 1.5 ns 49