Specifications
44
Chapter 3: Testing Performance
Connect the test equipment for the minimum clock interval/minimum eye width test
Connect the test equipment for the minimum clock
interval/minimum eye width test
Connect the 16760A Logic Analyzer Pod to the 8133A Pulse
Generator
1 Connect a Transition Time Converter (if required—see page 39) to each of
the four outputs of the 8133A pulse generator: Channel 1 OUTPUT,
Channel 1 OUTPUT
, Channel 2 OUTPUT, Channel 2 OUTPUT.
2 Connect the two SMA/Flying Lead test connectors (see “To assemble the
SMA/Flying Lead test connectors” on page 34) with 50 ohm terminators to
the Transition Time Converters at the 8133A pulse generator Channel 1
OUTPUT and Channel 1 OUTPUT. (If Transition Time Converters are not
required, connect the SMA/Flying Lead test connectors directly to the
pulse generator outputs.)
3 Connect the two SMA/Flying Lead test connectors without 50 ohm
terminators to the Transition Time Converters at the 8133A pulse
generator Channel 2 OUTPUT and Channel 2 OUTPUT. (If Transition Time
Converters are not required, connect the SMA/Flying Lead test connectors
directly to the pulse generator outputs.)
4 Connect an E5382A Flying Lead Probe Set to Pod 1 of the 16760A logic
analyzer.
5 Connect the E5382A Flying Lead Probe Set’s CLK lead to the pin strip of
the SMA/Flying Lead connector at the 8133A pulse generator’s Channel 1
OUTPUT.
ground clip