User`s guide
v
Measurements, 1-26
Theory of Operation, 1-29
numeric, 1-8
numeric label, 1-8
nurse call
connector, 1-5, 2-15
Nurse Call Relay
Performance Test, 4-22
On-Off/Standby button, 1-4
Parts
listing, 7-4
parts and accessories, v
Parts History, 7-2
Passwords, 4-6
patient
leakage current, 2-2
name, 1-8
safety, 2-2
Patient safety checks, 4-24
performance, v
Performance Assurance Test, 4-7
Power On Test, 4-6
Power Supply related problems, 5-20
PRESS
zero button, 1-6
Press
performance check, 4-20
Press/Temp, Extension, 1-41, 1-48
Pressure
theory of operation, 1-34
Pressure Zero & Check Cal message, 5-38
Preventative Maintenance, 3-5
Preventive Maintenance Tests, 4-10
printer
connecting, 2-21
port, 1-4
selecting, 2-18
Printer Connection
troubleshooting, 5-40
Printer Manager, 1-13
protection class (IEC 601-1, class 1), 2-2
protective earth, 2-2
protective grounding, 2-2
Pump
replacement, 3-7
Quick Link connector, 1-5, 1-6, 2-15
reliability, v
Remedy, 5-17
Removing the Backlight Tubes, 6-7, 6-11
Removing the Battery, 6-2
Removing the Chassis, 6-3
Removing the Connector Board, 6-9
Removing the LCD Assembly, 6-7
Removing the Power Supply, 6-2
Removing the Speaker, 6-9
Removing the System Board, 6-5
repairs, v
REPLACE BATTERY
INOP description, 5-14
Replacement Parts, A-1