Technical data

Service and Maintenance 8
Operating Checklist
E364xA User’s and Service Guide 179
Operating Checklist
Before returning your power supply to Agilent for service or
repair, check the following items:
Is the power supply inoperative?
Verify that the AC power cord is connected to the power
supply.
Verify that the front panel power switch has been pushed.
Verify that the power- line fuse is installed and not open.
(Refer to
“If the power supply does not turn on” on
page 9.)
Verify the power- line voltage setting. (Refer to “If the
power supply does not turn on” on page 9.)
Does the power supply fail the self-test?
Verify that the correct power- line voltage is selected.
(Refer to
“Connecting power to the power supply” on
page 9.)
Remove all load connections to the power supply.
(Ensure that all terminal connections are removed while
the self- test is performed.)