Technical data
1 Installation
14 Agilent Multimode for 6210/6220 TOF Installation and Maintenance Guide
Step 4. Install the three 10MΩ cables
1 While the instrument is vented and the analyzer board is out, install the
cables in series with the output cable for the Vcap/Vchamber and APCI
power supplies. The cables can be installed with the analyzer board
installed. It is easier with the analyzer board out.
Figure 4 Left: Two M-F 10 MΩ ballast MIDGI cables (p/n G1978-60806) and one M-F
10MΩ ballast SCID cable (p/n G1978-60805). Right: APCI cable connected in
series with ouput
2 Connect one of the M-F 10MΩ ballast MIDGI cable (p/n G1978-60806) in
series with the existing cable and plug it back into to APCI power supply.
Figure 5 Three cables connected in series with power supply outputs