Specifications

Checklists 3
Hardware Installation 51
EI ion source removed
CI ion source installed
CI interface tip seal installed
MSD pumped down and baked out for 2 hours
Software set up for CI operation
Purge Cal Valve performed
Methane reagent gas flow set up
Acceptable air and water background verified
PCI performance verification (if applicable)
PCI autotune performed
PCI sensitivity verified
NCI performance verification (if applicable)
NCI autotune performed
NCI sensitivity verified
High Mass performance verification (if applicable)
High Mass Checkout performed