Specifications

Checklists 3
Hardware Installation 49
PFDTD vial for CI cal valve filled
Preparing the vacuum system
Plugs removed from the foreline pump
Foreline pump line voltage verified to match available AC power
Line voltage identification sticker installed on MSD
Oil drip pan under the foreline pump
Foreline hose connected to the pump
Pump exhaust vented to a fume hood or the oil trap installed
Foreline pump power cord plugged into MSD
G3397A High Vacuum Gauge Controller installed (required for CI MSDs)
Plumbing the methane line to the CI MSD
Methane/isobutane gas purifier installed
Regulator pressure set to 20 psig (do not exceed 30 psig).
Gas purifier and lines purged
Methane reagent gas lines plumbed to flow module
Connecting the MSD and the GC
GC power turned off
GC/MSD interface heater cable connected
MSD positioned with interface in GC oven
Sideplate thumbscrews loosened completely; analyzer opened
Column installed in the GC/MSD interface
Remote cable connected between the GC and the MSD
Foreline pump and AC supply power cords connected to the MSD.
MSD plugged in
MSD power on (press on the sideplate)