Specifications

48 Hardware Installation
3 Checklists
GC plumbed
Configuring the GC
ALS installed (optional)
Merlin Microseal installed (optional)
GC plugged in and turned on
GC passes self-test
Column parameters configured
Carrier gas line pressure set to approximately 414 kPa (60 psi)
Column flow rate set to 5 mL/min (split flow to 200 mL/min)
Conditioning the column
Free end of column trimmed
Helium flow through column verified
Inlet temperature set to 300 °C
Oven temperature ramped from 40 °C to 300°C at 15 °C per minute and
held for 10 minutes
5 µL of methanol injected into GC; repeated two more times at 5-minute
intervals
Inlet set to 250 °C
GC power off
MSD installation
Preparing the MSD for installation
MSD and foreline pump unpacked and placed on the bench
MSD top cover removed
Vent valve opened to equalize pressure
PFTBA vial for EI cal valve filled