Specifications
Checklists 3
Hardware Installation 47
Shipment damaged or incomplete:
GC installation
The following steps are general, and may differ slightly depending upon the
series of GC used.
GC placed on an appropriate bench
Upper front knockout in the interior oven wall removed
The two large plastic knockouts removed from the left side panel
Left side panel reinstalled; GC/MSD interface cable routed through the rear
hole
Connecting helium lines to the GC
Carrier gas supply plumbed with copper tubing
Plumbing purged with helium at 35 to 55 kPa (5 to 8 psi) for 5 to 10 minutes
Gas purifier plumbed and purged
Distribution center notified (date):
Damaged or missing material:
Person contacted:
DM notified (date):