Specifications
4 Hardware Installation
Conditioning the Column 29
Preparing the MSD for Installation 30
Preparing the Vacuum System 31
Plumbing the Methane Line to the CI MSD Flow Module 34
Connecting the MSD and the GC 36
Installing the ChemStation PC 39
Verifying EI System Performance 40
Verify the tune performance 40
Verify the sensitivity performance 40
Switching from EI to CI Operating Mode 41
Verifying CI System Performance 42
Verify PCI performance 42
Verify NCI performance 42
Verifying High Mass System Performance 43
Familiarizing the Customer 44
3 Checklists
Installation Checklist 46
Verifying that site preparation is complete 46
Unpacking and inspecting the shipped materials 46
GC installation 47
MSD installation 48
MSD ChemStation PC installation 50
Performance verification 50
Instrument Log Book updated 52
Customer Familiarization Checklist 53
Topics not included in familiarization 53
Hardware overview 54
System operation 54